1-19-11
The tank is in.
They are hooking it up today.
That thing is 8' deep!
I'm not sure when we are going to break the street up and run the lines across but it should be soon.
We may have the parking lot done in a few weeks.
List of things to do (As far as I know)
Finish electrical work.
Insulation and drywall.
Install the heating and AC.
Install the hot water heater, sink, toilet, grunt bars, and dispensers.
Get the internet hooked up.
Painting
Seal the floor
Make a sign that says I can't stack anything above 12' and I have to paint a red line all the way around the inside at 12'.
Finish grading the parking lot and pave it.
Make a handicap parking space (Lots of those guys are getting into motocross).
Paint the parking lot lines.
Install bicycle parking space and lock up rack.
Plant city required trees, shrubs, and grass.
Get the final from the city.