Because of some family matters I haven't done much with the bike.
And It's standing at work, have no place at home. normaly its in my fan.
But yesterday in my lunchbreak I have drilled the swingarm hole up to 17mm, was a easy thing to do.
It whas a 45min job to take the clutch and cover of for smooth survice, and drill it.
Today put the engine in, and it doens't fit in the front. But now i now whats in it's way and what i have
to cut out the frame.
Should I make a welding calibre( If translated correct) for deforming when welding on the frame?
Or Is that not a probleme?
The main frame tubes are BIG and massive.
Dutchie