Hi everyone,
I have bee busy over the past few weekends and now have some pics to show. Everything is now tacked in place and all brackets made.
All aligned and I will be welding it up in the next few weeks. I can't wait.
The airbox is 90% finished using a 89 KX250 air box boot. Lines up pretty nicely.
This was the starting point
I used the original KLX lower engine brackets using 2 spacers from the KLX front engine brackets.
Interestingly, the KLX engine weighed in at 33kgs, and the KX500 weighed in at 27Kgs.
Muffler and Bracket
Clearance of the SH Pipe and dummy fitup
Top view and the MZB ingnition. I am lucky with this as the CDI and coil are in one unit. Meaning that I only have to find a place to mount the one item and not two.
More pics to follow.